![]() Warning: unknown parameter PARALLEL in parameter file (line 16). Last error code set: No entry with key 'SAI_ADDRESS_V'.įor the resolution i followed SAP Note 1902974 but still the issue persists with output as below : Severe error(s) occured in phase MAIN_SHDIMP/SUBMOD_SHDALIASCRE/EU_CLONE_CRE_SHDVIEWS! Wishing all of you a very Happy New Year 2014 !!!ĭuring SAP Upgrade from ECC 5.0 to ECC 6.0 EHP 6 i'm getting a error during Preprocessing phase: ![]() TOOLS: Highest return code of single steps was: 0ĮRRORS: Highest tp internal error was: 0232Įdited by: Francisco José Martínez Carretero on 3:50 PM TRACE-INFO: 19: Could not load DB2 library libdb2.a(shr_64.o). TRACE-INFO: 18: 0509-026 System error: A file or directory in the path name does not exist." (errno=2,No such file or directory) Tp unlocksys TEC pf=/usr/sap/trans/bin/TP_DOMAIN_TEC.PFL The shadow instance is not available any more, so SAPup is working only in the real instance. SAPup is now in phase PARCONV_UPG (387/505). I need to unlock the system in order to log in with a user different from DDIC. ![]() I'm upgrading a system from 4.5B to ECC 6.0.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |